Skip to content

Advisors who have carried a plant P&L and run a third shift.

The partners who scope your diagnostic are the engineers beside your press operators on Monday morning.

Built for the plants in between

Northline Operations Advisory was founded for mid-market plants between $35M and $450M in revenue: operations large enough to suffer multi-site scheduling drift and changeover losses, yet lean enough that every week of trapped WIP cash hits EBITDA directly. We work across the Great Lakes and Ontario corridors on fixed-scope engagements.

  • Floor baselines before slides

    Signed off by the plant manager in week two.

  • Supervisor-built standard work

    Shift-handover tools built on the line, not in spreadsheets.

  • CFO-reconciled results

    Every throughput or working-capital claim ties to ledger impact.

Principal advisors

  • Martin Vance, P.Eng.

    Managing Principal, Plant Operations and Lean Systems

    Read bio of Martin Vance, P.Eng.

    Twenty-four years leading multi-plant automotive stamping, forging and heavy assembly turnarounds across Illinois, Michigan and Ontario. Former VP of Manufacturing for a $380M Tier 2 powertrain supplier.

  • Claire Mercier, P.Eng.

    Partner, Supply Chain, S&OP and Working Capital (EN/FR)

    Read bio of Claire Mercier, P.Eng.

    Industrial engineer specializing in constraint-based scheduling, inventory buffer design and plant consolidation math for PE-backed manufacturers across the Great Lakes and Quebec.

  • David K. Lindqvist

    Senior Operations Director, Changeover and Tooling (SMED)

    Read bio of David K. Lindqvist

    Toolmaker by trade and mechanical engineer who has led over 140 press, extrusion and CNC changeover compressions, routinely cutting setup windows by 30% to 55% without new capital equipment.

  • Sonia Patel

    Principal, Tiered Daily Management and Floor Sustainment

    Read bio of Sonia Patel

    Builds the daily management systems supervisors run after the engagement ends: shift huddles, escalation boards and leader standard work, checked in monthly floor audits until the rhythm holds without outside help.

Having Martin and David on the floor at 5:30 a.m. shift handover earned immediate credibility with our press leads.

Plant Director, Precision Hydraulics Group

Size a 30-minute partner conversation

Book a consultation

Run the floor checklist yourself first

Get the Operations Review Guide