Floor implementation
SMED Changeover Reduction
Cut setup time and increase capacity.

Overview
Changeover time is capacity you already own. We film the changeover, separate internal from external work and move preparation off the critical path, so presses and cells spend more of the shift making parts.
No new capital equipment is assumed. Die carts, staging and standard sheets come first.
What you get
Changeover video study
Every element timed and classified with the crew.
External setup matrix
Preparation moved off the critical changeover path.
Point-of-use staging
Dies, tools and gauges where the crew needs them.
Standard changeover sheets
Written with the crew and posted at the machine.
How it runs
Format: 6–8 week floor sprint
-
Film and time
Record the current changeover with the crew that runs it.
-
Separate the work
Split internal and external elements; remove waste.
-
Stage and trial
Stage tooling at point of use and trial the new sequence.
-
Lock the standard
Train each shift and post the standard at the machine.

Your contact
David K. Lindqvist
Senior Operations Director, Changeover and Tooling (SMED)
Format: 6–8 week floor sprint
Schedule with David K. LindqvistCommon questions
Can we start with a single production line?
Yes. A Targeted Floor Sprint is scoped to one value stream. Many clients prove the method on their constraint line before extending it across a site.
Do you work alongside our team?
Yes. The partners who scope the work are on the floor with your supervisors and operators. Standard work is built on the line with the people who will run it, not handed over in a report.
Size a 30-minute partner conversation
Book a consultationRun the floor checklist yourself first
Get the Operations Review Guide