Floor implementation
Throughput and OEE Recovery
Find the constraint. Restore a repeatable run rate.

Overview
We work beside your team to expose bottleneck losses, stabilize the run and make each shift more predictable.
The work happens at the constraint: centerline settings, shift handovers and a weekly scorecard the supervisors own.
What you get
Bottleneck telemetry audit
What the constraint actually does, shift by shift.
Centerline run standards
Settings and checks that keep the line at rate.
Shift handover cadence
Actions and ownership carried cleanly across shifts.
Weekly floor scorecard
Run by supervisors, reconciled with the ledger.
How it runs
Format: 8-week embedded floor sprint
-
Baseline walk
Walk the constraint with each shift and sign the baseline.
-
Loss tree lock
Agree loss categories and the order of attack.
-
Shift trials
Trial centerlines and handovers on live shifts.
-
Supervisor handoff
Supervisors own the standards and the scorecard.

Your contact
Martin Vance, P.Eng.
Managing Principal, Plant Operations and Lean Systems
Format: 8-week embedded floor sprint
Schedule with Martin VanceCommon questions
How soon will we see a baseline?
Within the first two weeks. We walk the value stream with each shift, agree the loss categories and have the plant manager sign the baseline before any change is made.
What happens after the sprint?
Supervisors own the run standards and the weekly scorecard from the handoff week. Plants that want help holding the rhythm move to Tiered Daily Sustainment, with monthly floor audits.