Floor Execution

Measuring True OEE Baselines Before Buying Iron

A useful baseline starts at the machine. Record planned production time, stops, actual cycles and good parts before deciding where to invest.

Count what the machine does, not what the report says

Before a capital request, walk the constraint with each shift and agree how stops are counted. A short stop logged as “running” on one shift and as downtime on another makes every later number argue with itself.

FactorMeasureBaseline
AvailabilityRun time / planned time82.0%
PerformanceIdeal / actual cycle91.0%
QualityGood / total parts98.0%

OEE = Availability × Performance × Quality. With the factors above, the line runs at about 73% OEE before anything is bought.

Sign it before you change it

Have the plant manager sign the baseline before the first improvement. Every later claim, in throughput or in cash, is measured against that signature.