Scheduling Around the Constraint

A schedule that ignores the bottleneck builds WIP in front of it. Set the pace at the constraint and let the rest follow.
Working Capital on the Floor

Trapped WIP is cash a CFO can count. Tie every floor change to the ledger and the conversation with finance gets shorter.