Case study, Precision machining
Precision Hydraulics Machining — Cell Rebalance
Rebalancing machining cells for a hydraulics manufacturer where long setups and scrap held back a growing order book.

- Setup time cut (SMED)
- 34.0%
- Scrap reduction
- 14.2%
Challenge
Machining cells were loaded unevenly and long setups pushed operators to run oversized batches. Scrap rose at the end of long runs and the order book was outgrowing the cells.
Approach
We filmed changeovers with the crews, moved preparation off the critical path and rebalanced work across cells around the constraint machine. Shift handovers were held at the cell, at 5:30 a.m., with the press leads.
Outcome
Setup time fell 34.0% and scrap fell 14.2%, without new capital equipment.
Having Martin and David on the floor at 5:30 a.m. shift handover earned immediate credibility with our press leads.