Skip to content

Floor implementation

Throughput and OEE Recovery

Find the constraint. Restore a repeatable run rate.

Overview

We work beside your team to expose bottleneck losses, stabilize the run and make each shift more predictable.

The work happens at the constraint: centerline settings, shift handovers and a weekly scorecard the supervisors own.

What you get

  • Bottleneck telemetry audit

    What the constraint actually does, shift by shift.

  • Centerline run standards

    Settings and checks that keep the line at rate.

  • Shift handover cadence

    Actions and ownership carried cleanly across shifts.

  • Weekly floor scorecard

    Run by supervisors, reconciled with the ledger.

How it runs

Format: 8-week embedded floor sprint

  1. Baseline walk

    Week 1

    Walk the constraint with each shift and sign the baseline.

  2. Loss tree lock

    Weeks 2–3

    Agree loss categories and the order of attack.

  3. Shift trials

    Weeks 4–6

    Trial centerlines and handovers on live shifts.

  4. Supervisor handoff

    Weeks 7–8

    Supervisors own the standards and the scorecard.

Your contact

Martin Vance, P.Eng.

Managing Principal, Plant Operations and Lean Systems

Format: 8-week embedded floor sprint

Schedule with Martin Vance

Common questions

How soon will we see a baseline?

Within the first two weeks. We walk the value stream with each shift, agree the loss categories and have the plant manager sign the baseline before any change is made.

What happens after the sprint?

Supervisors own the run standards and the weekly scorecard from the handoff week. Plants that want help holding the rhythm move to Tiered Daily Sustainment, with monthly floor audits.

Size a 30-minute partner conversation

Book a consultation

Run the floor checklist yourself first

Get the Operations Review Guide