Case study, Food & beverage
Beverage Canning and Packaging — High-Speed Line
Shortening format changeovers on a high-speed canning line so more of each shift goes to production.

- Changeover time
- −38%
Challenge
Frequent format changes on a high-speed line meant long stops between runs. Each changeover depended on which crew was on shift.
Approach
We separated internal and external setup, staged change parts at point of use and wrote one standard sequence with the crews from every shift.
Outcome
Changeover time fell 38% and became consistent across shifts.
Size a 30-minute partner conversation
Book a consultationRun the floor checklist yourself first
Get the Operations Review Guide

