Skip to content

Case study, Food & beverage

Beverage Canning and Packaging — High-Speed Line

Shortening format changeovers on a high-speed canning line so more of each shift goes to production.

Changeover time
−38%

Challenge

Frequent format changes on a high-speed line meant long stops between runs. Each changeover depended on which crew was on shift.

Approach

We separated internal and external setup, staged change parts at point of use and wrote one standard sequence with the crews from every shift.

Outcome

Changeover time fell 38% and became consistent across shifts.

Size a 30-minute partner conversation

Book a consultation

Run the floor checklist yourself first

Get the Operations Review Guide