Floor implementation

SMED Changeover Reduction

Cut setup time and increase capacity.

Overview

Changeover time is capacity you already own. We film the changeover, separate internal from external work and move preparation off the critical path, so presses and cells spend more of the shift making parts.

No new capital equipment is assumed. Die carts, staging and standard sheets come first.

What you get

  • Changeover video study

    Every element timed and classified with the crew.

  • External setup matrix

    Preparation moved off the critical changeover path.

  • Point-of-use staging

    Dies, tools and gauges where the crew needs them.

  • Standard changeover sheets

    Written with the crew and posted at the machine.

How it runs

Format: 6–8 week floor sprint

  1. Film and time

    Week 1

    Record the current changeover with the crew that runs it.

  2. Separate the work

    Week 2

    Split internal and external elements; remove waste.

  3. Stage and trial

    Weeks 3–5

    Stage tooling at point of use and trial the new sequence.

  4. Lock the standard

    Weeks 6–8

    Train each shift and post the standard at the machine.

Your contact

David K. Lindqvist

Senior Operations Director, Changeover and Tooling (SMED)

Format: 6–8 week floor sprint

Schedule with David K. Lindqvist

Common questions

Can we start with a single production line?

Yes. A Targeted Floor Sprint is scoped to one value stream. Many clients prove the method on their constraint line before extending it across a site.

Do you work alongside our team?

Yes. The partners who scope the work are on the floor with your supervisors and operators. Standard work is built on the line with the people who will run it, not handed over in a report.

Size a 30-minute partner conversation

Book a consultation

Run the floor checklist yourself first

Get the Operations Review Guide