Skip to content

Case study, Extrusion

Architectural Extrusion — Die Staging and Flow

Die staging and scheduling changes that raised press utilization at an architectural extrusion plant.

Press utilization
+22%

Challenge

Presses waited on dies that were not ready, and the schedule did not account for die preparation time.

Approach

We set up point-of-use die staging and scheduled die preparation alongside press runs so the next die was ready before the current run ended.

Outcome

Press utilization rose 22%.

Size a 30-minute partner conversation

Book a consultation

Run the floor checklist yourself first

Get the Operations Review Guide