Case study, Extrusion
Architectural Extrusion — Die Staging and Flow
Die staging and scheduling changes that raised press utilization at an architectural extrusion plant.

- Press utilization
- +22%
Challenge
Presses waited on dies that were not ready, and the schedule did not account for die preparation time.
Approach
We set up point-of-use die staging and scheduled die preparation alongside press runs so the next die was ready before the current run ended.
Outcome
Press utilization rose 22%.
Size a 30-minute partner conversation
Book a consultationRun the floor checklist yourself first
Get the Operations Review Guide


